What is a Specification?
A specification is a precise description of the requirements of a specific project or component. It defines the standards, quality, and materials to be employed to ensure that everyone knows what to anticipate.
What are RFIs?
RFIs, or Request for Information, are questions asked by contractors or teams if they require more information concerning a project. They serve to clear uncertainties and make certain that all stakeholders have the same information to prevent errors and delays.
What are Submittals?
Submittals are documents written by contractors and submitted to architects or engineers for approval. Submittals may be plans, material samples, or product information. Submittals provide assurance that the work will be according to the project’s specifications and quality prior to work being undertaken.
What are RFIs used for?
Requests for Information (RFIs) are valuable resources in construction and other project-oriented sectors. They are utilized to request clarification of plans, drawings, specifications, and contracts. When project information is unclear or additional explanation is required, team members issue an RFI to get clear-cut answers. Miscommunication is thus avoided, everyone is on the same page, and expensive errors or project schedule delays are prevented. RFIs smooth the process by giving answers beforehand, facilitating better decision-making and project delivery.
Why are submittals used?
Submittals are utilized in the construction industry as part of quality control. Contractors are required to submit detailed information and samples to architects, engineers, or project managers for acceptance before work starts or purchase of specific products. The process provides assurance that the materials and intended methods meet project specifications and standards. Submittals provide quality assurance, compliance with design intentions, and provide a documented trail of the decision-making process through the project. Through review and approval of the documents, the project leaders are able to assure that the construction is in compliance with the design intentions and regulatory standards, reducing the risk of rework and maintaining the integrity of the project.
RFIs in the Submittal Process
During the submittal process, RFIs (Requests for Information) are an effective tool to ensure that all details of a project are well understood and agreed upon prior to proceeding. Contractors utilize RFIs to request clarification of the project specifications included in the submittals when inconsistencies, discrepancies, or incomplete data are found. This may involve questions related to dimensions, material specifications, or installation procedures. By resolving these matters in the early stages of the process using RFIs, contractors can avoid costly errors and delays, ensuring the project stays within its budget and timeline.
Example of an RFI in Construction
An everyday example of an RFI in building construction would be that a contractor needs to know more details about the building’s foundation plans. When the architectural designs require a particular foundation depth but fail to indicate what reinforcement is needed, the contractor can send an RFI for detailed information regarding the required reinforcement, rebar size, and spacing, in order to provide the foundation with structural stability.
Uses for Submittals
Construction submittals play a variety of significant roles:

Compliance Verification:
Submittals allow project managers and architects to verify that the submitted products and materials by contractors meet the project specifications and design intent. The submittal review process ensures that all the elements are consistent with the overall project vision.
Quality Assurance:
Equipment and material quality can be inspected and accepted via the submittal process before buying and installation. This is crucial to ensure high standards in the construction process.
Planning and Coordination:
Submittals synchronize the activities of different teams involved in the project. The work can be planned and scheduled better by the project managers by reviewing and approving the documents, and all the elements are present at the time needed.
Legal and Record Keeping:
Submittals are a legal record of what has been accepted for use in the project, with a trail of documentation that is valuable for warranty claims, maintenance, or future renovations. This documentation is critical for dispute resolution and ensuring that all parties complied with the standards agreed upon.
By and large, submittals and RFIs are an integral part of the construction process and contribute significantly towards ensuring project accuracy, quality, and compliance with specified parameters and specifications.
Frequently Asked Questions (FAQs)
1. What happens if an RFI is not answered?
If an RFI is neglected, it can cause delays, miscommunication, or incorrect work, since the team does not have the information they need to move forward with confidence. It’s essential to reply to RFIs in a timely manner to preserve project momentum and prevent expensive errors.
2. How long does it take to get a submittal approved?
The duration to receive submittal approval might be time-dependent depending on the complexity of the project, quality of submitted documents, and availability of the review parties. As a rule of thumb, it may take a few days to two weeks. Proper preparation and good communication can make the process faster.
3. Can RFIs and submittals be avoided in a project?
Though minimizing the number of RFIs and submittals is the goal, they are a natural and unavoidable part of most construction projects. They bring clarity and compliance to project standards and thus cannot be avoided. But clear first-time specs and active project management can reduce their frequency.