Comparing 6 construction project delivery methods

Comparing 6 construction project delivery methods

Share this article :

In the construction industry, a project delivery method is a comprehensive system used to define the way a project is structured, managed, and executed from start to finish. It outlines the relationships, roles, and responsibilities of all parties involved, setting the framework for how the project will be completed, who will bear the risk, and how costs are monitored and controlled.

There are six main types of project delivery methods available in the construction industry, each tailored to different project needs and situations. These project delivery methods range from traditional approaches, like design-bid-build, to more collaborative arrangements, such as design-build or integrated project delivery, offering varying degrees of efficiency, risk distribution, and involvement for the project owner and contractors. Each method has its unique attributes and choosing the right one can significantly impact the success of a project.

Construction project delivery methods: pros and cons

In the construction industry, selecting the appropriate project delivery method is essential as it significantly influences the project’s structure, efficiency, and ultimate success. Let’s delve into the six common methods, describing each and analyzing their advantages and disadvantages.

project delivery methods

1. Design-Bid-Build (DBB)

The Design-Bid-Build method is a conventional and sequential approach, where the design phase is finalized by an architect or engineer before inviting contractors to bid for the construction work. The project owner maintains separate agreements with both the designer and the contractor.

Pros:

  • Clear contractual boundaries simplify the process.
  • Competitive bidding can potentially lower costs.
  • Design changes are easier to manage as they occur before construction begins.

Cons:

  • The sequential phases can extend the project timeline.
  • Limited collaboration between designer and builder can lead to misunderstandings or conflicts.
  • Changes during construction can become costly and time-consuming.

2. Design-Build (DB)

The Design-Build method simplifies project delivery via a unified contract between the project owner and a design-build team. This team collaborates from the outset of the project through to its completion, integrating both design and construction services.

Pros:

  • Faster completion as design and construction phases overlap.
  • Single point of responsibility reduces client management burden.
  • Enhanced collaboration can lead to innovative solutions and efficiencies.

Cons:

  • Less owner control over the design, leading to potential compromises in project vision.
  • Reduced checks and balances since the same party is designing and building.
  • This might lead to higher costs due to the reduced competitive nature of the bidding process.

3. Construction Manager at Risk (CMAR)

In the CMAR model, the construction manager pledges to complete the project within a Guaranteed Maximum Price (GMP), effectively managing the budget and any potential overages. The construction manager serves as a consultant during the design stage and takes on the role similar to a general contractor during the construction phase.

Pros:

  • CMAR provides early cost advice and project feasibility input.
  • Shared risk motivates the manager to stay within budget.
  • Flexibility to adjust scope without extensive delays.

Cons:

  • Potential for higher initial costs as CMARs include fees for consultancy.
  • The owner might get less competitive pricing due to the GMP.
  • Relies heavily on the manager’s expertise and integrity.

4. Construction Management Multi-Prime (CMMP)

CMMP involves the owner contracting with several prime contractors who are responsible for different segments of the work. A construction manager coordinates all the prime contractors’ activities.

Pros:

  • Owner can directly influence negotiations and contracts.
  • Potential for faster project completion through simultaneous phases.
  • Increased control over the project’s various components.

Cons:

  • Coordination complexity can lead to managerial challenges.
  • Increased risk of miscommunication and scheduling conflicts among multiple contractors.
  • Owner assumes more risk for overlapping construction activities.

5. Public-Private Partnerships (PPP or P3)

This approach involves an agreement between a governmental body and a private entity. The private entity delivers a public service or project, taking on significant financial, technical, and operational risks.

Pros:

  • Access to private sector resources and innovation.
  • Long-term quality and performance are incentivized.
  • Risk is shared based on the ability of the parties to manage them.

Cons:

  • Complex negotiations and contracts can prolong project setup.
  • Public concerns over private sector control of public services.
  • Potential for higher lifecycle costs due to private sector investment returns.

6. Integrated Project Delivery (IPD)

IPD brings together people, systems, business structures, and practices into a process that collaboratively harnesses the talents and insights of all participants to optimize project results.

Pros:

  • Enhanced collaboration leads to fewer disputes and changes.
  • All major stakeholders share risk and reward, promoting unity.
  • High level of transparency increases trust and aligns interests.

Cons:

  • Requires a cultural shift and willingness to collaborate deeply.
  • Legal and regulatory environments may not support IPD structures.
  • The success of the project strongly relies on the unity and dedication of the team involved.

Factors to consider while choosing project delivery method

When choosing a project delivery method, consider the following factors:

construction project delivery methods

Project Complexity: More complex projects may benefit from collaborative methods like Design-Build or Integrated Project Delivery, which offer greater flexibility.

Risk Tolerance: Consider your appetite for risk. Traditional methods like Design-Bid-Build place most of the risk on the owner, while Construction Manager at Risk involves shared risk.

Budget and Time Constraints: If your project requires strict budget and timeline adherence, consider methods like the Construction Manager at Risk with a Guaranteed Maximum Price.

Quality Goals: If achieving high-quality outcomes and innovative solutions is a priority, look for methods that enhance collaboration between all project stakeholders.

Team Expertise and Resources: Evaluate the capabilities and resources of your team. Some methods, due to their complex nature, require a highly experienced management team.

Comparison of project delivery methods

Here’s a comparison table that highlights the essential features of commonly used project delivery methods to aid your decision-making process:

MethodOwner ControlRisk AllocationProject SpeedCost CertaintyTeam Collaboration
Design-Bid-BuildHighOwnerSlowerHighLow
Design-BuildModerateSharedFasterModerateHigh
CMARModerateSharedModerateHighModerate
CMMPHighOwnerVariableLowLow
PPP (P3)LowPrivate SectorModerateModerateHigh
IPDLowSharedFastHighVery High

“Control Level” defines the extent of the owner’s influence over the entire project. “Risk” denotes which party primarily shoulders the potential risks. “Speed” describes how quickly the project is expected to progress toward completion. “Cost Predictability” refers to how accurately the total cost can be anticipated by the project’s end. “Collaboration” assesses the degree of cooperative effort required from all involved parties.

Decision-Making Process

Using the insights gained from these definitions and the comparison table, you can more effectively determine which project delivery method best suits your project’s specific goals and limitations. For example, if your project demands a high degree of innovation and you are comfortable with a moderate level of risk, Integrated Project Delivery could be the ideal choice. On the other hand, if controlling costs and adhering to a strict schedule are crucial, opting for the Construction Manager at Risk method with a Guaranteed Maximum Price might be more appropriate.

Selecting the optimal project delivery method is crucial as it influences the direction, efficiency, and ultimate success of your construction project. It’s important to thoroughly evaluate how each method’s features match up with your project’s particular requirements to ensure you make the best possible decision.

Table of Contents
Ready to Supercharge⚡
your Projects?
Experience the revolution in the construction industry with streamlined, seamless and efficient project management.

RDash Videos

Ready to get started?

Fill out the form below and we will contact you as soon as possible.

Solutions
Who We Serve
Services
Pricing
Company
Resources
Play Video
Play Video